Metro Parkway (SR 739) from south of Daniels Parkway to Winkler Ave. - Design
District Office
L.K. Nandam
District One Secretary
801 N. Broadway Ave.
Bartow, Florida 33830-3809
Tel: 800-292-3368
Fax: 863-534-7265
Additional Contacts
Staff Directory
Welcome
Welcome to the web site for the Metro Parkway (State Road (SR) 739) design project. The project limits are from south of Daniels Parkway to Winkler Avenue, a distance of approximately 4.5 miles. FDOT is preparing design plans to expand Metro Parkway (SR 739) from a four lane divided roadway to a six lane divided roadway. The alternatives will include six foot wide sidewalks and 7 foot buffered bike lanes in each direction. In addition, a traffic study has been completed that included the evaluation of improvement alternatives at the intersection of Metro Parkway (SR 739) and Daniels Parkway and the intersection of Metro Parkway (SR 739) and Colonial Boulevard. The study recommended Two-Way Continuous Flow Intersections at both of these locations. Metro Parkway (SR 739) is a north-south urban principal arterial roadway in Lee County. The project limits are identified on the project location map.
Project At-A-Glance
District
One (Lee County)
Start Date
June 5, 2013
Design Completion Date
December 2025 (Pending Funding for Construction)
Cost
Construction-$78,304,000
Lengths and Limits
Limits are from south of Daniels Parkway (MP 3.895) to Winkler Avenue (MP 8.320).
Design Consultant
Comprehensive Engineering Services (CES)
Project Manager
Chris Speese